Voltage Transformer Truck

Withdrawable voltage transformer trucks are designed for voltage measurement, metering and protection in medium-voltage switchgear. The withdrawable arrangement allows voltage transformers and primary fuses to be isolated and removed for inspection, maintenance or replacement without requiring permanent fixed installation inside the panel.

Project-specific voltage transformer arrangements are available according to switchgear and system requirements.

Key Ratings

  • Rated Voltage

    Up to 40.5 kV

  • Installation

    Withdrawable

  • VT Arrangement

    3 × Single-Pole VT / Project-Specific

  • Primary Fuse

    MV Current-Limiting Fuse

  • Applicable Standards

    IEC 61869-3 / IEC 62271-200

Configuration Options

  • 01

    Primary Fuses

    MV current-limiting fuses for primary-side protection.
  • 02

    Surge Arresters

    Optional for applications requiring additional overvoltage protection.

Operating Positions

  • Service Position

    Primary and secondary metering circuits connected for normal operation.
  • Test / Disconnected Position

    Primary circuit disconnected, with secondary connections available according to the switchgear design.
  • Withdrawn Position

    Truck fully withdrawn from the switchgear compartment for inspection, maintenance or replacement.

Technical Specifications

Rated Voltage 12 / 17.5 / 24 / 40.5 kV
Rated Frequency 50 / 60 Hz
Installation Withdrawable
VT Arrangement 3 × Single-Pole VT / Project-Specific
Primary Fuse MV Current-Limiting Fuse / Project-Specific
Surge Arrester Optional / Project-Specific
Voltage Ratio According to System Requirements
Accuracy Class According to Metering / Protection Requirements
Rated Burden Project-Specific
Secondary Winding Single / Multiple Windings / Project-Specific
Applicable Standards IEC 61869-3 / IEC 62271-200

Note: Truck dimensions, primary contact arrangement, interlocking interfaces and secondary connections are configured according to the switchgear design and project requirements.

Standards, Testing & Documentation

IEC-Oriented Design

IEC-Oriented Design

Instrument transformers are specified with reference to IEC 61869-3 series, while the withdrawable truck arrangement and switchgear integration are designed according to IEC 62271-200 requirements.

Factory Inspection

Factory Inspection

Electrical checks, mechanical operation, contact alignment and interlocking functions are verified before shipment.

Project Documentation

Project Documentation

Technical datasheets, outline drawings, wiring diagrams, voltage transformer data and inspection records can be provided.

Download Product Catalogue

Discuss Your Voltage Transformer Truck Requirements

Share your system voltage, voltage ratio, accuracy class, rated burden, switchgear type and interface requirements with our engineering team.

return-top

    Need a quote for your project?

    Share your requirements and our team will typically respond within 1 business day.

    Fields marked with an * are required.

    Full Name *

    Email Address *

    Company Name

    Country / Region *

    WhatsApp / Mobile

    Project Requirements / Message *

    WeChat

    WeChat QR Code

    Scan to Chat

    Open WeChat and scan to connect